HISTORY

The top of the ride has now been put on along with the arms that support the seats. When the ride is in operation these arm's will swing back and forth (like a big swing) giving immense amounts of airtime at the top of each swing. Fencing has also been finished off and the ride now has a sign out the front.

LINKS

Rush Construction - 11th May 2005

Rush
Rush
Rush Sign
Rush
Rush Height Checker
Rush Entrance
Rush
Rush
Rush

back to top